• All Products

      • Charge Air Coolers
        • Charge Air Coolers

          Used to cool the hot, compressed air from the turbo before it reaches the engine, the intercoolers improve engine efficiency and reduce emissions for marine and land-based stationary engines.

      • Exhaust Gas Heat Exchangers
        • Exhaust Gas Heat Exchangers

          Exhaust gas heat exchangers are designed to recover waste heat energy from the exhaust stream of reciprocating engine powered generating sets.

      • Fuel Coolers
        • Fuel Coolers

          Bowman 'copper free' fuel coolers are compact, highly efficient heat exchangers suitable for fuel conditioning rigs in the automotive testing industry.

      • Header Tank Heat Exchangers
        • Header Tank Heat Exchangers

          Engine coolant header tank heat exchangers for marine propulsion, gensets or stationary land-based engines.

      • Hot Tub Heat Exchangers
        • Hot Tub Heat Exchangers

          Bowman EC 80-5113-1T heat exchangers provide a new solution for heating spas and hot tubs in just a fraction of the time taken by traditional electric heaters.

      • Hydraulic Oil Coolers
        • Hydraulic Oil Coolers

          Highly efficient heat transfer solutions for cooling marine, land-based and underground hydraulic systems.

      • Inline Plate Type Heat Exchangers
        • Inline Plate Type Heat Exchangers

          Bowman inline plate heat exchangers are a compact, economical solution for high efficiency heat transfer.

      • Marine Engine Coolers
        • Marine Engine Coolers

          Bespoke cooling solutions for a range of popular marine engines from major OEMs, including coolant heat exchangers, charge air coolers, plus combined heat exchangers and exhaust manifolds, suitable for cooling marine engines up to 1 MW.

      • Marine Transmission Oil Coolers
        • Marine Transmission Oil Coolers

          Bowman has a range of highly efficient oil coolers designed for marine and industrial engines and transmissions.

      • Electric and Hybrid Coolers
        • Electric and Hybrid Coolers

          Efficient heat exchangers for cooling electric marine motors, hydrogen fuel cells, battery packs, chargers, AC-DC converters, DC-DC converters, inverters and associated equipment for electric and hybrid marine propulsion and charging systems.

      • Shell and Tube Heat Exchangers
        • Shell and Tube Heat Exchangers

          Highly efficient heat transfer solutions for cooling a variety of applications where air and fluids need to be cooled by fluids.

      • Stainless Steel Heat Exchangers
        • Stainless Steel Heat Exchangers

          Many applications require stainless steel shell and tube heat exchangers and Bowman provide a standard range of units that are suitable for cooling or heating a variety of fluids.

      • Swimming Pool Heat Exchangers
        • Swimming Pool Heat Exchangers

          Bowman swimming pool heat exchangers are renowned for reliability and efficiency. Whether heating your pool with a traditional boiler or a renewable energy source, Bowman is the obvious choice.

    • All Applications

      • Automotive Testing
        • Automotive Testing

          Premium quality heat exchangers and oil coolers for precise temperature control of engines under test cell development conditions.

      • CHP / Co-Generation
        • CHP / Co-Generation

          Recovering waste heat energy from engine powered generating sets for biogas, diesel and natural gas applications up to 1 MW.

      • Engine Cooling Solutions
        • Engine Cooling Solutions

          Efficient cooling for stationary / land-based engines where air cooling is either unavailable or inappropriate.

      • Electric & Hybrid Marine
        • Electric & Hybrid Marine

          The reliable solution for cooling Electric & Hybrid Marine Propulsion Systems.

      • Industrial Hydraulics
        • Industrial Hydraulics

          A comprehensive oil cooling solution for industrial hydraulic control systems, plus high temperature and mining applications.

      • Marine Hydraulics
        • Marine Hydraulics

          A complete solution for cooling complex on-board hydraulic equipment, including thruster and stabiliser systems.

      • Marine Propulsion
        • Marine Propulsion

          The complete cooling solution for marine engine propulsion, including the latest electric and hybrid systems.

      • Hot Tubs / Spas
        • Hot Tubs / Spas

          An energy efficient solution for heating hot tubs and swim spas faster, significantly reducing heat-up time for guest change-over periods.

      • Swimming Pool
        • Swimming Pool

          Quality heat exchangers for efficient swimming pool heating, using boiler or renewable energy heat sources.

  • Distributors
  • News
  • Knowledge Centre
  • Downloads
  • About Us
  • Contact Us

Bowman ‘Star’ in the Canadian Arctic!

With the approach of winter, temperatures fall dramatically so that the barges are frozen fast into the ice-covered river. Due to its remote location, for the next 6 months the only way in or out of the camp is by helicopter, or ice roads constructed on top of the frozen river!

The barge facility is now home and base camp for Horizon Marine’s 88 person crew, who will work throughout the winter months in one of the most remote oil and gas exploration facilities on earth!

With seasonal temperatures ranging from -17°C to -40°C, the working days are long, extremely cold and very dark in this North Canadian winter wilderness.
Supporting life in these freezer-like conditions is the ‘Arctic Star’; the base camp barge where the crew retreat for warmth and light during those dark winter days and nights!

Heat and power are valuable, vital resources, without which, the crew would surely perish in this hostile environment.

To ensure there is adequate provision of both, Frontier Power Products were commissioned by Horizon to design and build a Combined Heat and Power (CHP) system to replace the previous two independent 400 kW gen-sets, which had no heat recovery system.

The solution proposed by Frontier used three 150 kW (270 hp) John Deere generating sets, arranged to operate in parallel, with automatic controls enabling the units to start up and shut down individually, to cater for the varying electrical demands of the camp.

A heat recovery system was also required for the gen-sets’ engines and here, Frontier relied on Bowman’s technical expertise to provide the correct specification heat exchangers to harvest heat energy from the engines’ cooling and exhaust systems.

Bowman proposed a solution comprising three shell and tube heat exchangers to cool and recover heat from the engines’ jacket water, plus three exhaust gas heat exchangers to recover the high levels of waste heat generated from the engines’ exhaust stream.

Heat that would normally be rejected from the cooling and exhaust systems is recovered by the Bowman units and then piped to and dispersed throughout the camp. The Bowman heat recovery solution has proved to be extremely reliable, as the original heat exchangers have now been in operation for around 25,000 hours, since installation 12 years ago. During that time, the ‘Artic Star’s’ fuel costs have reduced by around 33%, thanks to the addition of the heat recovery system.

Share

Bowman ‘Star’ in the Canadian Arctic!

For 12 years, Bowman CHP heat exchangers have provided life-sustaining heat through the harsh North Canadian Winter.
For 12 years, Bowman CHP heat exchangers have provided life-sustaining heat through the harsh North Canadian Winter. As summer turns in to fall and before the great Mackenzie River freezes over, several large barges are transported along the river’s icy waters. Once secured in position, they form an oil and gas exploration camp, which operates from October through to June each year and has done so for the past 12 years.

With the approach of winter, temperatures fall dramatically so that the barges are frozen fast into the ice-covered river. Due to its remote location, for the next 6 months the only way in or out of the camp is by helicopter, or ice roads constructed on top of the frozen river!

The barge facility is now home and base camp for Horizon Marine’s 88 person crew, who will work throughout the winter months in one of the most remote oil and gas exploration facilities on earth!

With seasonal temperatures ranging from -17°C to -40°C, the working days are long, extremely cold and very dark in this North Canadian winter wilderness.
Supporting life in these freezer-like conditions is the ‘Arctic Star’; the base camp barge where the crew retreat for warmth and light during those dark winter days and nights!

Heat and power are valuable, vital resources, without which, the crew would surely perish in this hostile environment.

To ensure there is adequate provision of both, Frontier Power Products were commissioned by Horizon to design and build a Combined Heat and Power (CHP) system to replace the previous two independent 400 kW gen-sets, which had no heat recovery system.

The solution proposed by Frontier used three 150 kW (270 hp) John Deere generating sets, arranged to operate in parallel, with automatic controls enabling the units to start up and shut down individually, to cater for the varying electrical demands of the camp.

A heat recovery system was also required for the gen-sets’ engines and here, Frontier relied on Bowman’s technical expertise to provide the correct specification heat exchangers to harvest heat energy from the engines’ cooling and exhaust systems.

Bowman proposed a solution comprising three shell and tube heat exchangers to cool and recover heat from the engines’ jacket water, plus three exhaust gas heat exchangers to recover the high levels of waste heat generated from the engines’ exhaust stream.

Heat that would normally be rejected from the cooling and exhaust systems is recovered by the Bowman units and then piped to and dispersed throughout the camp. The Bowman heat recovery solution has proved to be extremely reliable, as the original heat exchangers have now been in operation for around 25,000 hours, since installation 12 years ago. During that time, the ‘Artic Star’s’ fuel costs have reduced by around 33%, thanks to the addition of the heat recovery system.

More News from EJ Bowman

More News from EJ Bowman

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.